San Joaquin River Parkway, River Vista Public Access Project

2 Documents in Project

Summary

SCH Number
2015091016
Lead Agency
California San Joaquin River Conservancy (SJRC)
Document Title
San Joaquin River Parkway, River Vista Public Access Project
Document Type
NOD - Notice of Determination
Received
Posted
1/4/2016
Present Land Use
Public Open Space / Open Space
Document Description
The River Vista project proposes one mile trail extending the length of the project area along an existing gravel road. The trail will be approximately 3,800 linear feet in length, eight-feet wide, and allow for hiking and biking. There will be four main natural overlook areas for scenic vistas. One of the overlooks will be located at the southern end of the trail adjacent to a natural overlook areas for scenic vistas. One of the overlooks will be located at the southern end of the trail adjacent to a planned emergency vehicle turnaround. There will also be a 27 vehicle parking lot and two bus/recreational vehicle stalls located within an area that has been previously disturbed by past land uses. The project also includes the removal of the derelict bridge remnants within the San Joaquin River channel.

Contact Information

Name
Melinda Marks
Agency Name
San Joaquin River Conservancy
Contact Types
Lead/Public Agency

Location

Counties
Madera
Cross Streets
Road 206
Zip
93626
Total Acres
115
Parcel #
051-200-031
State Highways
Hwy 41
Waterways
San Joaquin River
Township
11S
Range
21E
Section
7
Base
MDB&M
Other Location Info
Friant

Notice of Determination

Approving Agency
San Joaquin River Conservancy
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print