Removal Action Workplan, Rockwood Charter High School
Summary
SCH Number
2015089016
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Removal Action Workplan, Rockwood Charter High School
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2015
Document Description
The project is the approval of a Removal Action Workplan (RAW) by the DTSC that would authorize activities to address hazardous materials including lead and total petroleum hydrocarbons detected in soil, and methane and volatile organic compounds detected in soil vapor at the proposed Rockwood Charter High School site. Activities to be conducted pursuant to the approved RAW include:
- Installation of vapor barriers with active venting/sub-slab depressurization beneath all structures to be constructed onsite;
- Installation of catch basins and passive venting beneath the hardscape areas to be constructed onsite;
- Recording a Land Use Covenant with the Los Angeles County Assessor's Office prohibiting certain activities that will disrupt the soil; and
- Developing an Operation and Maintenance Plan that will require long-term obligations of the landowner, including reporting requirements to the DTSC.
TSC.
Contact Information
Name
Shahir Haddad
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Counties
Los Angeles
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.