Prado Helitack Temporary Barracks Project

Summary

SCH Number
2015088184
Lead Agency
Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
Document Title
Prado Helitack Temporary Barracks Project
Document Type
NOE - Notice of Exemption
Received
Posted
8/19/2015

Document Description
This project consists of the installation of a three-piece modular unit (36 feet by 66 feet) to serve as barracks and office space for Helitack Program personnel. Electrical service installation will require a trench approximately 400 feet in length, 30 inches minimum depth, and 12 inches wide from the existing trasformer to the new modular building. Two new four-inch conduits and three new pull boxes will be used for conductor installation. New 1 1/2-inch underground polyethylene gas pipe installation will require a trench approximately 150 feet in length, 24 inches minimum depth, and four inches to 12 inches wide from the existing regulator and piping to the new modular building. A new six-inch sewer line will be provided to the buidling and will tie into exisitng services.

Contact Information
Henry Herrera
Cal Fire San Bernardino Unit Headquarters
3800 North Sierra Way
San Bernardino, CA 92405

Phone : (909) 475-8091

Location

Counties
San Bernardino
Other Location Info
Prado Canyon Conservation Camp

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303, Class 3
Reasons for Exemption
New construction of small structures. Utility extensions of reasonable length to serve such construction will occur.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print