Perdue Water Treatment Plant Hydroelectric Project

Summary

SCH Number
2015088031
Lead Agency
Sweetwater Authority
Document Title
Perdue Water Treatment Plant Hydroelectric Project
Document Type
NOE - Notice of Exemption
Received
Posted
8/4/2015

Document Description
Sweetwater Authority is proposing to install a hydroelectric station at the Perdue Water Treatment Plant (Perdue Plant) to generate and benefit from hydroelectric power, while at the same time reducing its footprint on the environment (proposed project). The hydroelectric station will have a total system power production of 580 kW, with an estimated annual generating capacity of 3,784 megawatt-hours. Excess power generated but not used at the Perdue Plant will be sold to San Diego County Water Authority's Pipeline 3 via the existing National City & South Bay No. 1 Connection (NC/SB1) turnout will be the source of pressure and flow to the new hydroelectric station.

Contact Information
Scott McClelland
Sweetwater Authority
100 Lakeview Avenue
Spring Valley, CA 91977

Phone : (619) 409-6802

Location

Counties
San Diego
Other Location Info
Unincorporated Community Spring Valley

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301. 3. 28 - C;ass 1. 3 & 28
Reasons for Exemption
The proposed project involves the installation of a small hydroelectric-generating facility at the Perdue Plant as described in Section 5.
Download CSV New Search