ADDENDUM TO THE FINAL SAMARITAN MEDICAL CENTER MASTER PLAN ENVIRONMENTAL IMPACT REPORT (EIR)

4 Documents in Project

Summary

SCH Number
2015082042
Lead Agency
City of San Jose
Document Title
ADDENDUM TO THE FINAL SAMARITAN MEDICAL CENTER MASTER PLAN ENVIRONMENTAL IMPACT REPORT (EIR)
Document Type
NOD - Notice of Determination
Received
Posted
3/13/2024
Document Description
In 2023, the Project Sponsor proposed modifications to the Samaritan Drive Project Area portion of the 2016 Project. Other than a reduction in size of one of the emergency standby diesel generators, no changes are proposed to the Samaritan Court Project Area. As noted above, the 2016 Project, as revised by these Proposed Modifications, is referred to as the Modified Project. Similar to the 2016 Project, the Modified Project would demolish the 12 existing single-story medical office buildings to develop the approximately 6.5-acre southern portion of the site at 2505 Samaritan Drive with two medical office buildings, one parking garage, and associated site improvements in Phases 3 and 4 (see Figure 4). The 2016 Project would also demolish the two-story medical office building on the northern portion of the Samaritan Drive Project Area and develop a replacement building of a similar size in Phase 5.

Contact Information

Name
Tina Garg
Agency Name
City of San Jose
Job Title
Supervising Planner
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
2577 Samaritan Drive
Zip
95124
Total Acres
13

Notice of Determination

Approving Agency
City of San Jose
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/environmental-planning/environmental-review/completed-eirs/samaritan-medical-center-master-plan-project

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print