Newell Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. EPIMS-SCL-43320-R3)

5 Documents in Project

Summary

SCH Number
2015082026
Lead Agency
City of Palo Alto
Document Title
Newell Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. EPIMS-SCL-43320-R3)
Document Type
NOD - Notice of Determination
Received
Posted
11/6/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SCL-43320-R3), pursuant to Fish and Game Code section 1602, to the project Applicant, Tess Byler/San Francisquito Joint Powers Authority and Michel Jeramias/City of Palo Alto. The purpose of this project is to remove the existing functionally obsolete bridge on Newell Road and the current bridge abutments in San Francisquito Creek and replace it with a wider bridge and abutments outside the creek channel. Mitigation activities will include replanting at the Reller Restoration site and performing invasive species removal just upstream of the bridge site.

Contact Information

Name
Alex Anstett
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Mateo, Santa Clara
Regions
San Francisco Bay Area
Other Location Info
The Project is located on the San Francisquito Creek at the bridge at Newell Road between Woodland Avenue and Edgewood Drive, Latitude 37,454322, Longitude -122.136684. Additional project mitigation activities will be located at the Reller Restoration site upstream at Latitude 37.458284, Longitude -122.145711.

Notice of Determination

Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerks
San Mateo, Santa Clara
Final Environmental Document Available at
The Final EIR prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print