West Lake Tahoe Regional Water Treatment Plant
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015082021
- Lead Agency
- Tahoe City Public Utility District
- Document Title
- West Lake Tahoe Regional Water Treatment Plant
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/12/2015
- Present Land Use
- Residential, 156 Chamberlands
- Document Description
- The Tahoe City Public Utility District will construct a water treatment plant at Lodge Drive/SR 89 in the community of Tahoma. The capacity at phase 1 will be 650 gallons per min, increasing to a max of 1,100 gallons per min in phase 2. An electrical/chemical feed room will be constructed at the site of the existing interim water treatment plant after the existing plant is decommissioned and demolished. The pump station at Chambers Landing Beach and raw water pipeline will be replaced with a new raw water pipeline and pumps submerged within Lake Tahoe.
- Contact Information
-
Matthew Homolka
Tahoe City Public Utility District
Lead/Public Agency
PO Box 5249
Tahoe City, CA 96145
Phone : (530) 580-6042
Location
- Coordinates
- 39°4'21"N 120°8'41"W
- Counties
- Placer
- Cross Streets
- Lodge Drive between Flicker Avenue and SR 89
- Zip
- 96142
- Total Acres
- 6.5
- Parcel #
- 098-330-004
- State Highways
- Hwy 89
- Waterways
- McKinney Creek, Lake Tahoe, Quail Crk, General Crk
- Township
- 14N
- Range
- 17E
- Section
- 7
- Other Location Info
- Tahoma
Notice of Determination
- Approving Agency
- Tahoe City Public Utility District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- http://www.tahoecitypud.com/
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.