Addendum No. 1 to the Mitigated Negative Declaration Cross Valley Canal Extension Lining Project

4 Documents in Project

Summary

SCH Number
2015081084
Lead Agency
Kern County Water Agency
Document Title
Addendum No. 1 to the Mitigated Negative Declaration Cross Valley Canal Extension Lining Project
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2023
Document Description
The Kern County Water Agency (Agency) operates and maintains the Cross Valley Canal (CVC), an approximately 22 mile canal located in Kern County. The CVC was constructed in 1976 and is used to deliver agricultural and urban water supplies to various purveyors and groundwater banking projects. The CVC is concrete lined along a majority of its length; however, the CVC Extension, an approximately three-mile section consisting of Pool Nos. 7 and 8, is earthen lined. The CVC Extension begins approximately one quarter mile east of Coffee Road and terminates at the Agency's Henry C. Garnett Water Purification Plant (HCGWPP) in Bakersfield, California. The CVC Extension is used to deliver water to Cawelo Water District and the Agency's Improvement District No. 4 (ID4), including State Water Project water. Water delivered to the HCGWPP is distributed to four retail water purveyors serving the greater Bakersfield area. The CVC Extension Lining (Project) proposed to line the CVC Extension with concrete to reduce seepage losses. As the CVC Extension facilities age, additional maintenance activities are required to maintain its functionality. Therefore, it may be necessary to conduct the following maintenance activities: 1. Repair, replace or otherwise modify fencing or access gates; 2. Repair, rebuild or otherwise modify the height of the eve Extension embankments; 3. Repair, rebuild or otherwise modify Pumping Plant No. 7; 4. Repair, rebuild or otherwise modify eve Extension culverts, siphons, turnouts and associated gates and traveling screens; 5. Provide, repair, rebuild or otherwise modify power and fiberoptics to CVC Extension infrastructure. These activities will not expand the existing footprint or capacity of the CVC Extension. The Agency Board of Directors, having conducted a careful and independent review of the proposed changes to Cross Valley Canal Extension Lining Project, described above, does hereby find and declare that said changes and additions are minor in nature and do not result in new significant environmental effects or substantially increase the severity of previously identified environmental effects, and do not call for the preparation of a subsequent negative declaration or environmental impact report pursuant to CEQA Guidelines § 15162. A brief statement of the reasons supporting the Board's findings is as follows: The proposed maintenance activities are within the area analyzed by the Biological Assessment and Culture Resource Study for the Mitigated Negative Declaration. The proposed changes will result in a less than significant change in ground disturbing activities and in the environmental effects associated with the Project as originally designed.

Contact Information

Name
Lauren Bauer
Agency Name
Kern County Water Agency
Job Title
Water Resources Manager
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Regions
Northern California
Cross Streets
Western End: Coffee Rd at Brimhall Rd; Eastern End; Arrow St and Rio Mirada Dr.
Zip
93308-09
Total Acres
116
Parcel #
Multiple
State Highways
Hwy 58, 99, 178, 204
Railways
Burlington Northern SF
Schools
7
Waterways
Kern River
Township
29S
Range
27E
Section
Multi
Base
MDB&M

Notice of Determination

Approving Agency
Kern County Water Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
3200 Mirada Drive Bakersfield, CA 93308

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print