Road 28 New K-6 Elementary School

3 Documents in Project

Summary

SCH Number
2015081044
Lead Agency
Madera Unified School District
Document Title
Road 28 New K-6 Elementary School
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Vacant land; IA - Institutional Area District
Document Description
The proposed Project is the construction and operation of an 850 student Kindergarten - 6th Grade school. The Project includes construction of academic and administrative buildings, a cafeteria, maintenance facilities, parking lots, playfields, infrastructure (water, sewer, storm drain) and associated site improvements. The site plan includes a parent drop off and parking area on the eastern portion of the site with driveways connecting to Tozer Street. A circular Kindergarten drop off is proposed south of the parking lot. A bus drop off area is proposed on South A Street. Construction is anticipated to begin in Summer of 2016 and will take approximately 14 months to complete.

Contact Information

Name
Rosalind Cox
Agency Name
Madera Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Madera
Counties
Madera
Cross Streets
Tozer and A Street
Zip
93637
Total Acres
18.96
Parcel #
035-221-001
State Highways
Hwy 99
Schools
Martin Luther MS
Township
11S
Range
18E
Section
19
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Department of Water Resources, Resources Agency, Department of Toxic Substances Control, California Department of Transportation, District 6 (DOT)
State Reviewing Agency Comments
Department of Toxic Substances Control, California Department of Transportation, District 6 (DOT)
Development Types
Educational (850 Student K-6 school on 18.96 acres)
Local Actions
School Construction
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print