Ventura Harbor Marina and Yacht Yard Expansion

4 Documents in Project

Summary

SCH Number
2015081011
Lead Agency
Ventura Port District
Document Title
Ventura Harbor Marina and Yacht Yard Expansion
Document Type
NOD - Notice of Determination
Received
Posted
11/23/2015
Present Land Use
Commerce/Harbor Commercial
Document Description
The project involves expansion and improvements of the existing Ventura Harbor Marina and Yacht Yard to increase the number of boat slips from 40 to 80 (40 new boat slips). The proposed expansion involves removing the existing dock structure, concrete ramps, a portion of the existing pier, and fuel docks; construction of an expanded dock structure; relocation of the fuel dock; onshore parking improvements; and other related facility improvements. The expanded dock would extend further into the main channel of Ventura Harbor as compared to the existing dock, but would be consistent with the channel limit considered by the Ventura Port District Commission in June 2014. The proposed parking improvements would require removal of several mature palm trees and other landscape elements.

Contact Information

Name
Jessica Rauch
Agency Name
Ventura Port District
Contact Types
Lead/Public Agency

Location

Cities
Ventura
Counties
Ventura
Cross Streets
Anchors Way Drive / Beachmont Street
Zip
93001
Total Acres
6.8
State Highways
Hwy 101
Railways
UPRR
Schools
Pierpont
Waterways
Pacific Ocean, Ventura Harbor

Notice of Determination

Approving Agency
Ventura Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print