Vistor Center Sewer Connection
Summary
SCH Number
2015078370
Public Agency
California Department of Parks and Recreation
Document Title
Vistor Center Sewer Connection
Document Type
NOE - Notice of Exemption
Received
Posted
7/23/2015
Document Description
Project will involve approx. 182' of trenching with heavy equipment from the sewage discharge of the Malibu Creek Visitor Center to the connection location of the Las Virgenes Municipal sewer line. The trench will be a minimum of 18" in depth and have a fall in grade of no less than 2%. 8" ABS pipe will be laid and fit in the trench with clean outs every 100' then tested for leaks by holding water at 4 PSI for 24 Hours. All trenching will be appropriately backfilled in lifts if necessary with adequate soil moisture content and compaction. All rehab work will be closely ordinated with resource staff. Septic tank will be backfilled with clean sand or gravel from a local quarry.
Contact Information
Name
Barbara Tejada
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency
Phone
Location
Counties
Los Angeles
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15303, Class 3
Reasons for Exemption
New Construction or Conversion.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.