M/L 4th Floor OR 29-Hybrid Build-Out, University of California, San Francisco

Summary

SCH Number
2015078167
Public Agency
University of California, San Francisco
Document Title
M/L 4th Floor OR 29-Hybrid Build-Out, University of California, San Francisco
Document Type
NOE - Notice of Exemption
Received
Posted
7/8/2015
Document Description
Project consists of an interior renovation of existing space of about 4,348 gross sq. ft. (or 2,519 assignable sq. ft.) on the 4th floor of Moffitt and Long Hospitals at the Parnassus Heights campus site. The project would renovate existing storage space into a hybrid operating room, which will allow for a coordinated approach to cardiac procedures formerly provided in two separate areas in the hospital. The proposed project will include new structural steel supports below the 4th floor slab to accommodate loads imposed by new equipment; lead-lined walls for shielding; renovation/upgrade of the HVAC and the utility systems; and hazardous material abatement.

Contact Information

Name
Diane Wong
Agency Name
University of California, San Francisco
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301, Class 1
Reasons for Exemption
Existing Facilities.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.