Azevada Elementary School Classrooms Addition Project

Summary

SCH Number
2015078100
Public Agency
Fremont Unified School District
Document Title
Azevada Elementary School Classrooms Addition Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/2/2015
Document Description
The Fremont Unified School District (District) is proposing to install as new building constructed of prefabricated components on the northwest area of the Azevada campus. This new building would be approximately 3,840 square feet in size and include four new general-use classrooms. After installation of the building, two existing temporary classrooms would be removed from the campus, resulting in a net increase of two classrooms within the campus. The proposed project would include removal and replacement of an existing play structure located on the project site in addition to the construction of a new walkway canopy.

Contact Information

Name
Therese Gain
Agency Name
Fremont Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15314
Reasons for Exemption
Minor additions to schools.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print