Seigler Canyon Road at Seigler Canyon Creek Bridge Rehabilitation (Lake or Streambed Alteration Agreement No. 1600-2015-0142-R2)

3 Documents in Project

Summary

SCH Number
2015072054
Lead Agency
Lake County
Document Title
Seigler Canyon Road at Seigler Canyon Creek Bridge Rehabilitation (Lake or Streambed Alteration Agreement No. 1600-2015-0142-R2)
Document Type
NOD - Notice of Determination
Received
Posted
9/8/2015
Present Land Use
Rural Lands
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0142-R2, pursuant to section 1602 of the fish and game code to the project applicant, County of Lake. The project is limited to rehabilitating the existing timber bridge over Seigler Canyon Creek. The existing bridge was constructed of 6-in by 18-in timber stringers which support at 4-in timber deck with a 4-in asphalt-concrete wearing surface. The existing 19-ft 7-in long and 22-ft 3-in wide bridge, will be removed and replaced. The new bridge will consist of a 6-in by 18-in timber girder, a 4-in timber deck, and a 3 to 4-in asphalt wearing surface. A waterproofing membrane will be installed to seal the deck before the asphalt surface is replaced. Tarps will be installed to catch any debris from falling into the creek. The stream channel is composed of mostly of bedrock and boulder and is concrete lined under the existing bridge.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Lake
Cross Streets
1.5 miles south of State Highway 29
Parcel #
012-004-35 & 012-004-07
State Highways
Hwy 29
Waterways
Seigler Canyon Creek
Township
12N
Range
7W
Section
17
Base
MDB&M
Other Location Info
Lower Lake

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print