Oak Ridge Drive Bridge Replacement Project
4 Documents in Project
Summary
SCH Number
2015072040
Lead Agency
City of Roseville
Document Title
Oak Ridge Drive Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2015
Present Land Use
LUD: LDR-3.5, MDR-8.7, OS/PR/FP
Z: FW, R1, P/QP, PD19 #4454, PD47 #1393
Document Description
The City of Roseville is proposing to replace the Oak Ridge Drive Bridge over Linda Creek and reconstruct Oak Ridge Drive, the bicycle pathway, and the floodwalls to conform to the new bridge. The project proposes to replace the narrow bridge to accommodate a standard width involving two travel lanes with standard shoulders (for bicycle lanes) and sidewalks. The new bridge and roadway profile would be elevated and lengthened to pass the design flood event in Linda Creek. The dimensions of the new bridge would be up to 80 feet long and up to 42 feet wide (two 1-foot rails, two 5-foot sidewalks, two 4-foot shoulders/bike lanes, and two 11-foot travel lanes).
Contact Information
Name
Mark Morse
Agency Name
City of Roseville
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Roseville
Counties
Placer
Cross Streets
Cirby Way/Oakridge Drive
Zip
95661
Parcel #
CIty right-of-way
State Highways
Hwy 80
Schools
Sierra Gardens ES
Waterways
Linda Creek
Township
10N
Range
8E
Section
12
Base
MDB&M
Notice of Determination
Approving Agency
City of Roseville
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.