Twitchell Island Dredged Material Placement Site

2 Documents in Project

Summary

SCH Number
2015072029
Lead Agency
Port of Stockton
Document Title
Twitchell Island Dredged Material Placement Site
Document Type
NOD - Notice of Determination
Received
Posted
8/2/2016
Document Description
The Port of Stockton proposes to construct two new placement sites on Twitchell Island (35 and 18 acres) and one new placement site on Mandeville Island (17 acres) for accepting maintenance dredged sediment from the Stockton Deep Water Ship Channel. The proposed project involves construction activities to prepare the new site for use, placing dredge slurry in the sites as part of federal operations and maintenance activities, and maintaining the sites between dredging episodes in the future as needed. Containment berms would be constructed around the perimeter of each proposed placement area using existing on-site soil, and there would be no impacts to wetlands or jurisdictional waters. Berm construction activities would occur over 6 weeks for each site and are expected to begin in August 2015 and be complete by summer of 2016.

Contact Information

Name
Jason Cashman
Agency Name
Port of Stockton
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
West Twitchell Island Road and Twitchell Island Ferry Road
Zip
95641
Total Acres
60
Parcel #
05701400210000, 15701400090000
State Highways
SR 160, 12
Railways
No
Airports
No
Schools
No
Waterways
San Joaquin River
Township
3N
Range
3E
Other Location Info
Rio Vista

Notice of Determination

Approving Agency
Stockton Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print