Sir Francis Drake Boulevard Improvements Project
5 Documents in Project
Summary
SCH Number
2015072028
Lead Agency
Marin County
Document Title
Sir Francis Drake Boulevard Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2018
Present Land Use
Point Reyes National Seashore covered in NPS General Mgmt Plan (1980); primarily "Pastoral Landscape Management"
Document Description
Proposed improvements, initially evaluated in an Initial Study in 2015, consist of resurfacing, restoring, and rehabilitating SFDB in a manner that will closely follow the existing roadway to minimize impacts to the naturak nterrain. In general, the project would widen the roadway 1 to 6 feet to maintain a consistent 24-foot width with two 11-foot travel lanes and 1-foot shoulders. Additional improvements evaluated under the subsequent initial study in 2018 include replacing the existing culverts under SFDB at Schooner Creek with a single-span bridge and restoring and stabilizing approximately 710 feet of SFDB that has severly eroded. To compensate for permanent wetland impacts as a result of roadway improvements, part of the parking lot at Brakes beach would be restored to a wetland, and two ponds would be constructed within Home Ranch to provide California red-legged frog aquatic breeding habitat. Actions at Drakes Beach and Home Ranch extend beyond the original study area analyzed in 2015
Contact Information
Name
Rachel Reid
Agency Name
Marin County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Marin
Cross Streets
Pierce Point Road and Chimney Rock Rd; Sir Frances Drake Blvd
Total Acres
90
State Highways
Hwy 1
Schools
Inverness ES
Waterways
Schooner Creek, East Schooner Creek
Other Location Info
Inverness
Notice of Determination
Approving Agency
Marin County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.