El Granada Pipeline Replacement Final Phase Project

2 Documents in Project

Summary

SCH Number
2015072027
Lead Agency
Coastside County Water District
Document Title
El Granada Pipeline Replacement Final Phase Project
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2015
Present Land Use
Z: Commercial Downtown (C-D)
Document Description
The project will replace the District's existing 10-inch welded steel pipeline crossing the Main Street Bridge in Half Moon Bay with new pipeline installed as follows: 1) 220 ft of 16-in ductile iron pipeline from existing 16-in pipeline in Main Street, along north side of Pilarcitos Creek; 2) 420 ft of 16-in (inner diameter) high-density polyethylene pipe under Pilarcitos Creek installed by horizontal directional drilling; 3) 470 ft of 16-in ductile iron pipeline from the cul-de-sac at the north end of Purissima St, south along Purissima St, then west on Mill St to Main St, connecting to the existing 16-in pipeline in Main St.

Contact Information

Name
David Dickson
Agency Name
Coastside County Water District
Contact Types
Lead/Public Agency

Location

Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
Purissma Street, Main Street and Mill Street
Zip
94019
Parcel #
056: 163-080, 240-130, 161-200 ROW
State Highways
Hwy 1 (Cabrillo Highway)
Waterways
Pilarcitos Creek

Notice of Determination

Approving Agency
Coastside County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print