Russian River Cotati Intertie Pipeline Seismic Hazard MItigation Project

4 Documents in Project

Summary

SCH Number
2015072007
Lead Agency
Sonoma County Water Agency
Document Title
Russian River Cotati Intertie Pipeline Seismic Hazard MItigation Project
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2016
Present Land Use
GP: Resources and Rural Development and Land Intensive Agricultural
Document Description
The project would include the following components: (1) abandon and replace sections of the existing Russian River-Cotati Intertie underground pipeline on the north and south sides of the Russian River; (2) abandon and replace an underground pipe connection to one of the Mirabel collector wells (referred to as Collector #5); and (3) installation of supporting components, including one meter vault, approx. 3 cathodic protection stations and/or corrosion test stations, air valves, and appurtenances. The Project consists of installation, operation, maintenance of approx. 1,080 linear feet of two, 48-inch diameter pipeline that runs beneath the Russian River channel. In addition, an existing 20-inch diameter pipe connection between Collector #5 and the Russian River-Cotati Intertie would be replaced with a new 328-foot steel pipe, and the above-mentioned supporting components of the Project would be installed.

Contact Information

Name
Connie Barton
Agency Name
Sonoma County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Sonoma
Cross Streets
River Road and Mirabel Avenue
Zip
95436
Total Acres
1.30
Parcel #
several
Schools
El Monte High School
Waterways
Russian River
Township
8N
Range
9W
Section
31,32
Base
Diablo
Other Location Info
Forestville

Notice of Determination

Approving Agency
Sonoma County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.