Interstate 15 Express Lanes Project

8 Documents in Project

Summary

SCH Number
2015071074
Lead Agency
Caltrans 8 (San Bernardino) (California Department of Transportation, District 8)
Document Title
Interstate 15 Express Lanes Project
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2016
Present Land Use
PLU: existing highway GPD: Freeway

Document Description
Construction one to two tolled express lanes along I-15 in RIV Cnty between PM 36.8 / PM 51.4. Advance signage will be a min. of 2 miles prior to start of TELs. Signage limits extend from PM 34.7 in RIV Cnty to PM 1.3 in SBd Cnty. Specifically the project provides: 1 TEL in each direction from Cajalco Rd to Hidden Valley Pkwy, 2 TELs in each direction from Hidden Valley Pkwy NB and Second St SB (Norco) to Cantu Galleano Ranch Rd (Eastvale/Jurupa Valley), and 1 TEL in each direction from Cantu Galleano Ranch Rd (Eastvale/Jurupa Valley) to SR-60, with isolated outside widening at Riverside Ave to maintain lane balance for SR-60 WB loop connector.

Contact Information
James Shankel
California Department of Transportation, District 8
464 W. 4th Street, 6th Floor
San Bernardino, CA 92401-1400

Phone : (909) 383-6379

Location

Coordinates
33°52'54.71"N 117°32'50.14"W
Cities
Corona Eastvale Jurupa Valley Norco
Counties
Riverside
Cross Streets
On I-15 from Cajalco Road (PM 36.8) to SR 60 (PM 51.4)
Total Acres
1023
State Highways
SR 60, 91, I-10
Railways
BNSF
Waterways
Santa Ana River, Temescal Wash, and Bedford Wash

Notice of Determination

Approving Agency
Caltrans District 8
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
4080 Lemon Street, 3rd Floor, Riverisde, CA 92502

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print