Removal Action Workplan, New Murray Middle School

3 Documents in Project

Summary

SCH Number
2015071053
Lead Agency
Sierra Sands Unified School District
Document Title
Removal Action Workplan, New Murray Middle School
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2015
Present Land Use
Mainsite Land Management Unit in the North Range of China Lake, regulated by the Department of the Navy
Document Description
The project is the approval of a Removal Action Workplan by the DTSC that would authorize activities to address organochlorine pesticides (OCPs) detected in shallow soil at the proposed New Murray School site. Activities to be conducted pursuant to the approved RAW include: - excavation of a burial cell onsite for impacted soil; - removal of impacted soil; - collection of confirmation soil samples from the exposed excavation sidewalls and bottoms; - backfill the burial cell to a depth no shallower than 2 ft below grade; - construction of an engineered cap, consisting of a permeable geotextile mat overlain by a 2-ft thick soil cover, above the buried soil; - development of some level of post construction institutional controls, including a DTSC approved land use restriction, so that future owners of the property were aware of the presence of buried pesticide impacted soil and the conditions applicable to its disturbance; and - development of a long term operation and maintenance program involving periodic inspections and as needed maintenance would be required to ensure that the cap remains undisturbed and continues to function as intended.

Contact Information

Name
Aslam Shareef
Agency Name
DTSC
Contact Types
Lead/Public Agency

Location

Cities
Ridgecrest
Counties
Kern
Cross Streets
Drummond Avenue and South Knox Road
Zip
93555
Total Acres
47
State Highways
China Lake Blvd (US 395)
Schools
Burroughs HS
Waterways
Satellite Lake
Township
26S
Range
40E
Section
34

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes