Eastern Coachella Valley Stormwater Master Plan
6 Documents in Project
Summary
SCH Number
2015071047
Lead Agency
Coachella Valley Water District
(CVWD)
Document Title
Eastern Coachella Valley Stormwater Master Plan
Document Type
OTH - Other Document
Received
Document Description
Note: Response to comment
The proposed Project is the administration, right-of-way acquisition (to the extent necessary) and construction of storm drains, channels, levees (collectively referred to as Facilities), and the operation and maintenance of Facilities identified in the ECV SMP. The Plan is a comprehensive conceptual stormwater master plan that identifies conceptual locations, alignments, and sizes for primary drainage Facilities to address the current and future drainage needs of the approximately 207 square mile Plan Area. The ECV SMP is intended to be used as a planning guide for locating and sizing regional stormwater facilities (SMP Facilities) that will be constructed by Coachella Valley Water District (CVWD), City of Coachella, and/or developers over time as development takes place within the area. When implemented, the Plan will provide flood protection to the area during a 100-year flood event.
Contact Information
Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Riverside
Cross Streets
various
Total Acres
107,456
State Highways
SR 86, 86S, 111, 195
Railways
UPRR
Airports
Desert Resorts Regional
Waterways
Whitewater River/Salton Sea
Base
SBB&M
Notice of Completion
Development Types
Other (Stormwater Master Plan)
Local Actions
Master Plan
Project Issues
Agriculture and Forestry Resources, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Hydrology/Water Quality, Noise
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.