MD-6 and MD-7 Water System Improvement
3 Documents in Project
Summary
SCH Number
2015071005
Lead Agency
Madera County
Document Title
MD-6 and MD-7 Water System Improvement
Document Type
NOD - Notice of Determination
Received
Posted
1/6/2017
Present Land Use
Rural residential and public water supply, (RAXX) assesor's Land use code
Document Description
The installation of water supply pipelines connecting the two districts and BLWC, booster pump stations to ensure adequate pressure, development of blending station, and the development of a new well to meet the summer demands of MD-6. Recent forest fires have heightened the concern over the lake of fire protection for residents in Marina View Subdivision located in MD-7. A 250,000 gallon storage tank containing non-potable water will be located on a vacant lot in the subdivision for fire suppression. A 42-gpm well pump for an existing well, discharge piping, valving and new electrical service will be included. Water meters will be installed on each improved lot.
Contact Information
Name
Becky Beavers
Agency Name
Madera County
Contact Types
Lead/Public Agency
Phone
Location
Counties
Madera
Cross Streets
Road 274, 38906 Fawn Point Lane, Bass Lake, CA
Zip
93604
Total Acres
.25
Parcel #
059-210-005
Township
75
Range
22E
Section
23
Base
MDB&M
Other Location Info
Lake Shore & Marina View
Notice of Determination
Approving Agency
County of Madera
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.