San Jacinto Valley Enhanced Recharge and Recovery Program

4 Documents in Project

Summary

SCH Number
2015071002
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
San Jacinto Valley Enhanced Recharge and Recovery Program
Document Type
NOD - Notice of Determination
Received
Posted
6/21/2018
Present Land Use
LUD: is City and the project is not in a general plan overlay area
Document Description
Eastern Municipal Water District is proposing to implement the San Jacinto Valley Water Banking - Enhanced Recharge and Recovery Program. The proposed program would allow EMWD to enhance current and future water supplies in the local groundwater basin by developing a groundwater water bank with total storage capacity of up to 90,000 af. Groundwater produced by the proposed program would be used within EMWD's service area water could also be made available to EMWD's sub agencies or other regional water agencies through an exchange, with no physical export of local supplies. The proposed program would include development of recharge facilities, extraction and monitoring wells, treatment/blending and disinfection facilities, potable and raw water transmission pipelines, well water collector pipelines, laterals from the raw water pipeline to the recharge sites, and other conveyance facilities and appurtenances required to support the proposed program. EMWD is proposing to implement the SJVWB ERRP in phases, Phase 1 project would be the first installment of the proposed program. EMWD is proposing to implement the San Jacinto Valley Water Valley Water Banking ERRP in phases; the San Jacinto Valley Water Banking ERRP - Phase 1 Project (Proposed Project) would be the first installment of the Proposed Program. The Proposed Project would implement groundwater recharge facilities at Mountain Avenue West to enable EMWD to recharge an average of approx. 7,000 to 30,000 AFY when recharge supplies are available, while relying on existing regional infrastructure to convey imported raw water to the proposed recharge basin. The proposed project also includes three new groundwater extraction wells, associated pipelines, monitoring wells, and treatment/blending and disinfection facilities to enable EMWD to initially extract and deliver up to 7,000 AFY to its existing potable water distribution system.

Contact Information

Name
Kelley Gage
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
San Jacinto
Counties
Riverside
Cross Streets
Mountain Avenue, Esplanade Ave, Lake Park Drive
Zip
92583
State Highways
Hwy 79
Schools
San Jacinto USD
Township
4/5S
Range
1W
Section
1/36
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.