100 & 110 Point San Pedro Road Maintenance Dredging

Summary

SCH Number
2015068404
Lead Agency
Fish & Wildlife 3 (Napa) (California Department of Fish and Wildlife, Region 3)
Document Title
100 & 110 Point San Pedro Road Maintenance Dredging
Document Type
NOE - Notice of Exemption
Received
Posted
6/24/2015

Document Description
Project involves dredging the bottom bay muds of the stream channel around the boat dock to remove approx. 2,200 cubic yards of accumulated bay-muds. The design dredging depth is -6 feet mean lower low water, plus an over depth allowance of 1-foot. In total, approx. .3 acres of channel will be dredged. A barge mounted clamshell dredge will be used to excavate the material which has been approved for disposal at the unconfined aquatic disposal site SF-10, San Pablo Bay Disposal site by the Dredge Materials and Management Office. Issuance of a Lakebed Alteration Agreement No. 100-2014-0377-R3 is pursuant to Fish and Game Code Section 1602.

Contact Information
Timothy S. Dodson
California Department of Fish and Wildlife, Region 3
7329 Silverado Trail
Napa, CA 94558

Phone : (707) 944-5513

Location

Cities
San Rafael
Counties
Marin

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15304, Class 4
Reasons for Exemption
Minor Alterations to Land.
Download CSV New Search