Pit 1 Hydroelectric Project, Federal Energy Regulatory Commission Project No. 2687 - 401 Water Quality Certification, Condition 13
Summary
SCH Number
2015068388
Public Agency
State Water Resources Control Board
Document Title
Pit 1 Hydroelectric Project, Federal Energy Regulatory Commission Project No. 2687 - 401 Water Quality Certification, Condition 13
Document Type
NOE - Notice of Exemption
Received
Posted
6/22/2015
Document Description
- Request for Temporary Cessation of Flushing Flow in 2015
PG&E operates the project, FERC No. 2687, for which FERC issued a new operating license on March 19, 2003. The FERC license for the Project includes the SWRCB's 401 water quality certification that requires PG&E to release flushing flows from the Pit 1 Forebay Dam to control nuisance aquatic vegetation and mosquito production in Fall River Pond. This project is for the temporary suspension of flushing flows required under Condition 13 of the Project's water quality certification in order to protect the Shasta crayfish, which was listed as endangered under both the CA and Federal Endangered Species Acts in 1988. The project impounds water to feed the Pit 1 powerhouse, which operates as a peaking plant to help PG&E meet daily load swings. The Pit 1 Forebay is a 222 acre impoundment immediately above the 0.7 mile long Fall River Pond.
Contact Information
Name
Peter Barnes
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Shasta
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15307, Class 7
Reasons for Exemption
Actions by Regulatory Agencies for the protection of Natural Resources.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.