Planning and Engineering Analysis for Renovations of the ACWD Storage Tank and Water Sources
2 Documents in Project
Summary
SCH Number
2015068181
Public Agency
State Water Resources Control Board
Document Title
Planning and Engineering Analysis for Renovations of the ACWD Storage Tank and Water Sources
Document Type
NOE - Notice of Exemption
Received
Posted
6/12/2015
Document Description
This project will conduct hydrogeolic and geotechnical studies and investigations to provide alternatives to the Alleghany County Water District for water system assessments and reports from CEQA and NEPA compliance. It will include development of a preferred alternative. The project will include a Site Survey for the preferred alternative, development of Plans, Specifications and Bid Package, and preparation of a Storm Water Pollution and Prevention Plan, and a Watershed Survey.
Contact Information
Name
Rae Bell
Agency Name
Alleghany County Water District
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Sierra
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15306, Class 6
Reasons for Exemption
Information Collection.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.