South Bay Aqueduct (SBA) Geotechnical Exploration
Summary
SCH Number
2015068056
Public Agency
California Department of Water Resources
(DWR)
Document Title
South Bay Aqueduct (SBA) Geotechnical Exploration
Document Type
NOE - Notice of Exemption
Received
Posted
6/4/2015
Document Description
Project involves the installation of four inclinometers. The geologic exploration will consist of four vertical borings with a truck-mounted CME 750 or similar drilling rig. Each boring will be approx. 8" in diameter and extend to a depth of 40 feet below existing grades. Cuttings will be spread on the ground adjacent to each drill hole. Where drill cuttings have the potential to erode, bio-degradable fiber rolls will be used. New access roads will be mowed prior to grading, and will be inspected by a biological monitor. Existing access roads and new access roads will be graded to allow the drill rig access.
Contact Information
Name
Jerry Snow
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Cities
Milpitas
Counties
Santa Clara
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15303, Class 3
Reasons for Exemption
New Construction or Conversion.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.