Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for California Waste Recovery Systems in Sacramento County, SWIS No. 34-AA-0231
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015062094
- Lead Agency
- City of Galt
- Document Title
- Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for California Waste Recovery Systems in Sacramento County, SWIS No. 34-AA-0231
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/3/2015
- Present Land Use
- Various
- Document Description
- Revised Solid Waste Facilities Permit to allow the following design and operational changes: Increase in max daily tonnage from 150 to 630. Addition of mixed/municipal solid waste, green waste and construction and demolition debris. Increase in traffic volume from 226 vehicles per day to 396 vehicles per day. Increase in permitted area from 6.29 acres to 6.68 acres.
- Contact Information
-
Nicholas Oliver
CalRecycle
Lead/Public Agency
P.O. Box 4025
Sacramento, CA 95812-4025
Phone : (916) 341-6599
Location
- Coordinates
- 38°16'13.55"N 121°18'42.75"W
- Cities
- Galt
- Counties
- Sacramento
- Cross Streets
- 175 Enterprise Court, Suite A
- Zip
- 95632
- Total Acres
- 6.68
- Parcel #
- 150-0110-0750
- State Highways
- SR-99, SR-104
- Railways
- UPRR
- Schools
- Various
- Township
- 5N
- Range
- 6E
- Section
- 21
- Base
- MDB&M
Notice of Determination
- Approving Agency
- CalRecycle
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 1001 I St, PO Box 4025, Sacramento, CA 95812-4025
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.