Green Valley Road Widening Project
6 Documents in Project
Summary
SCH Number
2015062091
Lead Agency
City of Folsom
Document Title
Green Valley Road Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2015
Present Land Use
Open Space, Residential and Commercial Development / Open Space Conservation, Business, and Residential District
Document Description
The project consists of widening Green Valley Road from two lanes to four lanes with left turn channelization, between East Natoma Street and Sophia Pkwy, totaling approximately 1.2 miles in length. The portions of Green Valley Road on either end of this segment have already been widened to four lanes with a Class II bicycle facility in each direction. This project would also include drainage improvements along Green Valley Road and along the Humbug-Willow Creek Trail to prevent flooding of Green Valley Road during storm events.
Contact Information
Name
Brian Reed
Agency Name
City of Folsom
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Folsom
Counties
El Dorado, Sacramento
Cross Streets
East Bidwell/Green Valley Road and Sophia Parkway/Green Valley Road
Zip
95630
Total Acres
91
Parcel #
071-0060-014, 071-0060-015
State Highways
Hwy 50
Railways
SPRR
Airports
No
Schools
Blanche Sprentz ES, Folsom MS
Waterways
Humbug Creek, Willow Creek, Natoma Ditch
Township
10N
Range
8E
Section
21/28
Base
MDB&M
Other Location Info
El Dorado Hills
Notice of Determination
Approving Agency
City of Folsom
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.