Silva Valley Parkway Class I/II Bike Path/Lane Project. CIP #72310
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015062082
- Lead Agency
- El Dorado County
- Document Title
- Silva Valley Parkway Class I/II Bike Path/Lane Project. CIP #72310
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/7/2015
- Present Land Use
- Road right-of-way; surrounding uses are medium and high density residential and open space
- Document Description
- The project consists of two components: a Class I multi-use path adjacent to Silva Valley Parkway and Class II bike lanes along Silva Valley Parkway. The Class I multi-use path between Harvard Way and Appian Way (1.1 miles) would have two 4-ft paved travel lanes and 2-ft graded shoulders on both sides. Signs and pavement markings would be placed along the multi-use path at intersection with existing roads and at strategic locations. The Class II bike lanes would be installed along the existing paved surface of the roadway, southbound (west) side of the road between Harvard Way and Green Valley Road (2 miles) and northbound (east) side of the road between Appian Way and Green Valley Road (0.9 mile). A more detailed project description can be found in the MND document.
- Contact Information
-
Janet Postlewait
El Dorado County, CDA, Trans. Division
Lead/Public Agency
2850 Fairlane Court
Placerville, CA 95667
Phone : (530) 621-5993
Location
- Counties
- El Dorado
- Cross Streets
- Silva Valley Parkway and Green Valley Road
- Total Acres
- 34
- State Highways
- Hwy 50
- Schools
- Middle & High Schools
- Waterways
- New York Creek
- Township
- 10N
- Range
- 8E
- Section
- 23/26
- Base
- MDB&M
- Other Location Info
- El Dorado Hills
Notice of Determination
- Approving Agency
- El Dorado County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- El Dorado County, 2850 Fairlane Court, Placerville, CA 95667
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.