Western Pacific Interceptor Canal 200-year Standard Project

7 Documents in Project

Summary

SCH Number
2015062074
Lead Agency
Three Rivers Levee Improvement Authority
Document Title
Western Pacific Interceptor Canal 200-year Standard Project
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2018
Present Land Use
Exclusive Agricultural / Important Farmland
Document Description
Approval of Permit No/ 19156, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream: To construct 4,000 linear feet of 3-stramd barbed wire fence parallel to and on the waterside of the WPIC West Levee. The fence will be located 15 feet from the waterside levee toe. Gates will be provided in the fence at 400 foot spacing (approximately 10 gates) to allow waterside access for maintenance purposes.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Bd
Contact Types
Lead/Public Agency

Location

Counties
Yuba
Cross Streets
Plumas-Arboga Road
Zip
95961
Total Acres
55
Parcel #
Various
State Highways
SR 70
Railways
UPRR
Schools
Cobblestone, Rio del Oro
Waterways
Western Pacific Interceptor Canal
Township
13/14
Range
4
Section
Varies
Other Location Info
Olivehurst

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print