Western Pacific Interceptor Canal 200-year Standard Project
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015062074
- Lead Agency
- Three Rivers Levee Improvement Authority
- Document Title
- Western Pacific Interceptor Canal 200-year Standard Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/9/2018
- Present Land Use
- Exclusive Agricultural / Important Farmland
- Document Description
- Approval of Permit No/ 19156, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream: To construct 4,000 linear feet of 3-stramd barbed wire fence parallel to and on the waterside of the WPIC West Levee. The fence will be located 15 feet from the waterside levee toe. Gates will be provided in the fence at 400 foot spacing (approximately 10 gates) to allow waterside access for maintenance purposes.
- Contact Information
-
James Herota
Central Valley Flood Protection Bd
Lead/Public Agency
3310 El Camino Ave, Suite 170
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 39°1'35"N 121°32'32"W
- Counties
- Yuba
- Cross Streets
- Plumas-Arboga Road
- Zip
- 95961
- Total Acres
- 55
- Parcel #
- Various
- State Highways
- SR 70
- Railways
- UPRR
- Schools
- Cobblestone, Rio del Oro
- Waterways
- Western Pacific Interceptor Canal
- Township
- 13/14
- Range
- 4
- Section
- Varies
- Other Location Info
- Olivehurst
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave, Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.