2015 El Dorado Irrigation District to Westlands Water District Temporary Water Transfer Project

2 Documents in Project

Summary

SCH Number
2015062065
Lead Agency
El Dorado Irrigation District
Document Title
2015 El Dorado Irrigation District to Westlands Water District Temporary Water Transfer Project
Document Type
NOD - Notice of Determination
Received
Posted
7/27/2015
Present Land Use
EID reservoirs; El Dorado National Forest, rural lands within El Dorado County, and Central Valley Project facilities
Document Description
EID proposes to transfer up to 3,100 acre-feet of water to Westland's Water District during summer and fall 2015. EID would make the water available through re-operations of EID reservoirs to release water otherwise planned to be consumed by EID customers and/or stored within the EID network of reservoirs. The transfer quantity includes approximately 700 AF that would be released from Weber Reservoir, and approximately 2,400 AF that would be released from Silver Lake. But for the Project, EID would otherwise retain the 700 AF in Weber Reservoir and add the 2,400 AF to storage in Jenkinson lake or use it directly to meet summer/fall 2015 demands that would instead be met with water previously stored in Jenkinson Lake.

Contact Information

Name
Dan Corcoran
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Mosquito Road and Upper Main Street
Zip
95726
State Highways
Hwy 50
Waterways
South Fork American River, American River, Sac River
Township
10N
Range
11E
Section
8
Base
MDB&M

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print