Penitencia Delivery Main and Penitencia Force Main Seismic Retrofit Project (Lake or Streambed Alteration Agreement No. 1600-2015-0394-R3)

3 Documents in Project

Summary

SCH Number
2015062061
Lead Agency
Santa Clara Valley Water District
Document Title
Penitencia Delivery Main and Penitencia Force Main Seismic Retrofit Project (Lake or Streambed Alteration Agreement No. 1600-2015-0394-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2016
Present Land Use
Lower Hillside; Public/Quasi-Public; Open Space, Parkland and Habitat; Residential Neighborhood
Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2015-0394-R3, pursuant to section 1602 of the fish and game code to the project applicant, Katherine Oven/Santa Clara Valley Water District. The purpose of the project is to perform a seismic retrofit of the Penitencia Delivery Main (PDM), the Penitencia Force Main (PFM), the South Bay Aqueduct (SBA), and the Finished Water Meter Vault (Meter Vault) to accommodate the creep and potentially extensive seismically-induced movements of the active Penitencia Creek Landslide over a 50 year design life. To complete the work, the raw water PDM (including a portion of the Central Pipeline), the treated water PFM , and the raw water SBA will be drained to the City of San Jose's storm drain system prior to starting construction. The storm drain system enters Sierra Creek at Zion Lane. Dewatering will be limited to a maximum discharge of 3 cubic feet per second.

Contact Information

Name
Tami Schane
Agency Name
CDFW Bay Delta
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
Piedmont Avenue, Grossmont Drive, Whitman Way
Zip
95132
Total Acres
7
State Highways
Hwy 680
Schools
Noble ES
Waterways
Sierra Creek, Berryessa Creek, Coyote Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print