Poplar Avenue Pump Station Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0036-R3)

3 Documents in Project

Summary

SCH Number
2015062055
Lead Agency
City of San Mateo
Document Title
Poplar Avenue Pump Station Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0036-R3)
Document Type
NOD - Notice of Determination
Received
Posted
1/3/2017
Present Land Use
Z: Shoreline
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0037-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of San Mateo Public Works Dept. Project is limited to replacing the existing pump station with an adjacent pump station, constructing a new wet well, routing the creek to the new wet well, retrofitting the existing building to house an emergency standby generator, and constructing a new electrical room between the existing building and new wet well. The new wet well will be located approx. 30 feet southeast of the existing wet well and will be approx. 75 feet in length and 35 feet wide at the entrance and the back wall where the pumps will be located. There will be approx. 300 cubic yards and 1200 sq. ft. of cut in the pump station forebay to construct the new wet well.

Contact Information

Name
Randi Adair
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Mateo
Counties
San Mateo
Cross Streets
Airport Boulevard for Coyote Point Site; Trollman Drive for Poplar Avenue Site
Zip
94401
State Highways
Hwy 101
Waterways
San Francisco Bay
Other Location Info
Coyote Point Recreation Area

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print