Poplar Avenue Pump Station Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0036-R3)
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015062055
- Lead Agency
- San Mateo, City of (City of San Mateo)
- Document Title
- Poplar Avenue Pump Station Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0036-R3)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/3/2017
- Present Land Use
- Z: Shoreline
- Document Description
- CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0037-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of San Mateo Public Works Dept. Project is limited to replacing the existing pump station with an adjacent pump station, constructing a new wet well, routing the creek to the new wet well, retrofitting the existing building to house an emergency standby generator, and constructing a new electrical room between the existing building and new wet well. The new wet well will be located approx. 30 feet southeast of the existing wet well and will be approx. 75 feet in length and 35 feet wide at the entrance and the back wall where the pumps will be located. There will be approx. 300 cubic yards and 1200 sq. ft. of cut in the pump station forebay to construct the new wet well.
- Contact Information
-
Randi Adair
CDFW
7329 Silverado Trail
Napa, CA 94558
Phone : (707) 576-2786
Location
- Cities
- San Mateo
- Counties
- San Mateo
- Cross Streets
- Airport Boulevard for Coyote Point Site; Trollman Drive for Poplar Avenue Site
- Zip
- 94401
- State Highways
- Hwy 101
- Waterways
- San Francisco Bay
- Other Location Info
- Coyote Point Recreation Area
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 7329 Silverado Trail, Napa, CA 94558
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.