Coyote Point Pump Station Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0037-R3)

3 Documents in Project

Summary

SCH Number
2015062055
Lead Agency
San Mateo, City of (City of San Mateo)
Document Title
Coyote Point Pump Station Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0037-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0037-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of San Mateo Public Works Dept. Project is limited to replacing the existing Coyote Point Pump Station with an adjacent pump station, constructing a new wet well, realigning the existing pump station forebay to route water to the new wet well retrofitting the existing building to house an emergency standby generator, constructing a new electrical room between the existing building and new wet well, raising the existing levee an average of three feet and replacing the existing Bay Trail on top of the levee. The existing channel will be realigned to the east to accommodate the intake for the new pump station and will be expanded to nine feet deep, 200 feet long and varying between 32 feet and 125 feet wide.

Contact Information
Randi Adair
CDFW
7329 Silverado Trail
Napa, CA 94558

707-576-2786

Location

Cities
San Mateo
Counties
San Mateo
Cross Streets
Airport Boulevard for Coyote Point Site; Trollman Drive for Poplar Avenue Site
Zip
94401
State Highways
Hwy 101
Waterways
San Francisco Bay
Other Location Info
Coyote Point Recreation Area

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No