Public Safety Facility Project

6 Documents in Project

Summary

SCH Number
2015062046
Lead Agency
El Dorado County
Document Title
Public Safety Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2016
Present Land Use
The 30.34 acre project site has historically been used for industrial operations and is currently vacant. The project site is designated Industrial according to the El Dorado County General Plan. The site zoned as Industrial as well.
Document Description
The proposed project would include the County's purchase of the property and subsequent development of a multi-building Public Safety Facility on approximately 11 acres of the 30.73-acre site for the El Dorado County Sheriff's Office, with a max development potential totaling approximately 106,331 sf. The proposed Public Safety Facility would centralize and consolidate the Sheriff's Office function currently operating out of seven different facilities. The other major project component consists of an approximately 7-acre solar farm facility, which would be located immediately west of the Public Safety Facility buildings. The 6.16-acre portion of the 30.73 acre site located north of Industrial Drive is not proposed for development as part of this project.

Contact Information

Name
Russ Fackrell
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Cities
Diamond Springs
Counties
El Dorado
Cross Streets
Industrial Drive and Merchandise Way
Zip
95619
Total Acres
30.34
Parcel #
329-240-55, 329-391-10
State Highways
SR-49
Railways
Sac-Placer Joint
Schools
Various
Township
10N
Range
10E
Section
24
Base
MDBM

Notice of Determination

Approving Agency
El Dorado County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print