Georgia Pacific Gypsum Antioch Wharf Upgrade Project

4 Documents in Project

Summary

SCH Number
2015062045
Lead Agency
California State Lands Commission
Document Title
Georgia Pacific Gypsum Antioch Wharf Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
8/21/2015

Document Description
Georgia Pacific Gypsum, LLC proposes to upgrade its Antioch Wharf on the San Joaquin River in Antioch. The Project would include the following: 1) Remove five existing timber breasting and mooring dolphins and two wooden walkways; 2) Install four new 72-inch-diameter hollow-core steel monopiles (each with a cone fender system) driven to about 65 feet below the mudline, and nine new walkway segments (connecting the new mooring dolphins) supported by six 24- to 30-inch-diameter steel-pipe piles driven to about 40 to 50 feet below the mudline; and 3) Repair one timber piling and 12 stringers on the wharf. All activities would be carried out from offshore (no uplands) over an approximate 8-week construction period. The State Lands Commission action is an acceptance of quitclaim deed and issuance of a 20-year General Lease - Industrial Use through December 1, 2035.

Contact Information
Vicki Caldwell
California State Lands Commission
100 Howe Avenue, Suite 100-South
Sacramento, CA 95825-8202

Phone : (916) 574-1900

Location

Coordinates
38°0'56.16"N 121°47'12.8"W
Cities
Antioch
Counties
Contra Costa
Cross Streets
Minaker Drive and Wilbur Avenue
Zip
94509
Total Acres
1.4
Parcel #
065-20-008-2 submerged
State Highways
Antioch Bridge
Schools
Cornerstone Christian
Waterways
San Joaquin River and Sacramento River
Township
2N
Range
2E
Section
1

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
California State Lands Commission, 100 Howe Avenue, Suite 100-South, Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No