Foothill Trunk Replacement Project (Streambed Alteration Agreement No. 1600-2016-0047-R2)

3 Documents in Project

Summary

SCH Number
2015062042
Lead Agency
South Placer Municipal Utility District
Document Title
Foothill Trunk Replacement Project (Streambed Alteration Agreement No. 1600-2016-0047-R2)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0047-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, South Placer Municipal Utility District. Project includes the installation of a sewer pipeline along Aguilar Creek to replace an existing, deteriorating pipeline between El Don Drive and Secret Ravine. One segment of the pipeline would cross an oxbow channel along the creek west of Aguilar Road, and another segment would cross a man-made pond along the creek between Arrowhead Drive and El Don Dr., requiring installation of a temporary dam (sand/clay bags) along the pond (although water is not likely to be present during construction). The pipeline would cross Aguilar Creek beneath an existing culvert in Aguilar Road; the culvert would not be affected by pipeline installation (trenchless construction methods would be used.

Contact Information
Angela Calderaro
CDFW
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

916-358-2920

Location

Cities
Rocklin
Counties
Placer
Cross Streets
El Don Drive, Aguilar Road
Total Acres
4
State Highways
I-80
Waterways
Aguilar Creek
Township
11N
Range
7E
Section
20
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search