Foothill Trunk Replacement Project

3 Documents in Project

Summary

SCH Number
2015062042
Lead Agency
South Placer Municipal Utility District (SPMUD)
Document Title
Foothill Trunk Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2015
Present Land Use
Single and multi-family residential
Document Description
SPMUD is proposing to replace its Foothill Trunk line, a 12-inch-diameter gravity sewer pipeline, with a new 24-inch-diameter pipeline in Rocklin, Placer County. The new pipeline would be approximately 2,300 feet long and would be installed either in the same alignment as or parallel to the existing pipeline or along a new alignment at depths of 5-17 feet below the ground surface. A temporary dam would be placed in Aguilar Creek to allow pipeline installation beneath a ponded area of the creek. Pipeline would be installed using primarily open-cut construction. Standard BMPs, dust control, and other measures would be implemented during construction.

Contact Information

Name
Herb Niederberger
Agency Name
South Placer Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Rocklin
Counties
Placer
Cross Streets
El Don Drive, Aguilar Road
Total Acres
4
State Highways
I-80
Waterways
Aguilar Creek
Township
11N
Range
7E
Section
20
Base
MDB&M

Notice of Determination

Approving Agency
South Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print