PA-1500070 (VR)
2 Documents in Project
Summary
SCH Number
2015062036
Lead Agency
San Joaquin County
Document Title
PA-1500070 (VR)
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2015
Present Land Use
Shopping center / Community Commercial (C-C)
Document Description
A Variance application no. PA-1500070 of Lincoln Properties, LTD. to vary the requirements of the Development Title to permit additional signs and to reduce the required setback for signs and walls within an existing shopping center in the community commercial zone in two phases over 5 years.
Phase 1 includes:
- construction of two additional signs and two replacement sings
- increasing the max permitted height of three walls from 3 ft to 6 ft
- increasing the max permitted ht of 1 wall from 3 ft to 9 ft
- reducing the required setback from 5 ft from future right of way lines to 0 ft for 1 monument sign
Phase 2 includes:
- construction of 2 additional poles for a single archway sign extending across the right of way for Benjamin Holt Drive
- reducing the required setback from 5 ft from future right of way lines to 0 ft for the archway sign poles.
Contact Information
Name
Sonia Serrano
Agency Name
San Joaquin County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Stockton
Counties
San Joaquin
Cross Streets
Gettysburg Place and Pacific Avenue
Zip
95220
Total Acres
14.97
Parcel #
097-410-20, -48, -73, -77, -78, -79
State Highways
I-5
Railways
UPRR
Schools
Lincoln, John Adams
Waterways
Calaveras River, Five & Fourteen Mile Sloughs, Bear Cr.
Township
2N
Range
6E
Section
21
Notice of Determination
Approving Agency
San Joaquin County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.