Douglas Avenue Multi-Family Residential Development Project

3 Documents in Project

Summary

SCH Number
2015062033
Lead Agency
City of Burlingame
Document Title
Douglas Avenue Multi-Family Residential Development Project
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2017
Present Land Use
1128-1132 Douglas Avenue: High-density Residential/R-4 District; 524 Oak Grove Avenue: Single-family Residential/R-1 District
Document Description
The applicant is proposing construction of a new, five-story, 27-unit residential apartment building with at-grade and below-grade parking at 1128-1132 Douglas Avenue, zoned R-4. The proposed project includes demolishing the existing house and detached garage at 1132 Douglas Ave. and demolishing the existing four-unit apartment building at 1128 Douglas Ave. The rear portion of the existing single family dwelling at 1128 Douglas Ave. is also proposed to be demolished, however the front half of the house is proposed to be relocated to 524 Oak Grove Ave. This includes a first and second story addition to the house moved from 1128 Douglas Ave. and construction of a new detached garage. the overall proposed height of the new apartment building is 56 feet 10 inches to the top of the roof. The project includes 3 studio units, 14 one-bedroom units, 9 two-bedroom units and 1 three-bedroom unit. The average unit size proposed is 950 SF. There will be 12 at-grade parking spaces at the rear of the lot and 22 parking spaces in an underground garage, accessed via a 14'-0" wide driveway located at the south end of the lot.

Contact Information

Name
William Meeker
Agency Name
City of Burlingame
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Zip
94010
State Highways
US 101
Railways
Caltrain
Airports
SF International
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
City of Burlingame
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print