Webb Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0409-R3)

4 Documents in Project

Summary

SCH Number
2015062029
Lead Agency
Midpeninsula Regional Open Space District
Document Title
Webb Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0409-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0409-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Midpeninsula Regional Open Space District. Project includes the demolition of an existing bridge, construction of a new bridge, creation of a fire truck turnout near the new bridge, and road repair. The bridge dimensions will be longer and wider than the existing bridge to account for 100-year storm events and access for fire trucks. The bridge deck will be 30 feet by 16 feet. The deck, abutments, and wingwalls will be poured concrete. Grading will occur to create the turnout and for road repair, which will include placement of aggregate base.

Contact Information
Kristin Garrison
CDFW
7329 Silverado Trail
NApa, CA 94558

707-944-5534

Location

Coordinates
37°10'"N 122°'"W
Cities
Los Gatos
Counties
Santa Clara
Cross Streets
Bear Creek Road
Zip
95033
Total Acres
1432
State Highways
Hwy 17 & 35
Schools
Lexington & Lakeside ES
Waterways
Lexington Reservoir
Township
9S
Range
1W
Section
8

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search