Webb Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0409-R3)

6 Documents in Project

Summary

SCH Number
2015062029
Lead Agency
Midpeninsula Regional Open Space District
Document Title
Webb Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0409-R3)
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2018
Present Land Use
Santa Clara County General Plan Land Use Designation: Other Public Open Lands; Santa Clara County Zoning: Hillside
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0409-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Midpeninsula Regional Open Space District. Project includes the demolition of an existing bridge, construction of a new bridge, creation of a fire truck turnout near the new bridge, and road repair. The bridge dimensions will be longer and wider than the existing bridge to account for 100-year storm events and access for fire trucks. The bridge deck will be 30 feet by 16 feet. The deck, abutments, and wingwalls will be poured concrete. Grading will occur to create the turnout and for road repair, which will include placement of aggregate base.

Contact Information

Name
Kristin Garrison
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Los Gatos
Counties
Santa Clara
Cross Streets
Bear Creek Road
Zip
95033
Total Acres
1432
State Highways
Hwy 17 & 35
Schools
Lexington & Lakeside ES
Waterways
Lexington Reservoir
Township
9S
Range
1W
Section
8

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print