Gold Hill Road Over Auburn Ravine Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0055-R2)

3 Documents in Project

Summary

SCH Number
2015062005
Lead Agency
Placer County
Document Title
Gold Hill Road Over Auburn Ravine Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0055-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2016
Present Land Use
Placer County Zone Designation: Farming - Building Site with 4.6 acre minimum size (F-B X 4.6 AC. Minimum.)
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0055-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Placer County Dept. of Public Works. The project includes replacement of the existing Auburn Ravine Bridge, which is a 65-foot long and 23 foot wide single span-reinforced concrete arch bridge (built in 1930) with a cast-in-place post-tensioned concrete box girder bridge. The proposed bridge will be approx. 92 feet long and will be supported on rigid diaphragm abutments, supported by spread footings. The abutments will be located behind the existing abutments and will be placed outside the limits of the Ordinary High Water Mark. Excavation depth at the abutments will be up to 20 feet, measured from the existing roadway surface. The Gold Hill Road bridge profile will be raised to provide hydraulic clearance required for the design hydrologic event. The top of the new bridge will be between one and three feet higher than the top of the existing bridge.

Contact Information

Name
Angela Calderaro
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Lincoln
Counties
Placer
Cross Streets
Gold Hill Road and Virginiatown Road
Zip
95658
Total Acres
20
State Highways
Hwy 193
Waterways
Auburn Ravine
Township
12N
Range
7E
Section
10

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No