Gold Hill Road Over Auburn Ravine Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2015062005
Lead Agency
Placer County
Document Title
Gold Hill Road Over Auburn Ravine Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2015
Present Land Use
Placer County Zone Designation: Farming - Building Site with 4.6 acre minimum size (F-B X 4.6 AC. Minimum.)

Document Description
The proposed improvements include the replacement of the existing bridge. The proposed bridge will be approximately 92 feet long and will be supported on seat type abutments. The abutments will be located behind the existing abutments and will be placed outside the limits of the Ordinary High Water Mark. Excavation depth at the abutments will be up to 20 feet, measured from the existing roadway surface. The Gold Hill Road bridge profile will be raised to provide hydraulic clearance required for the design hydrologic event. The roadway alignment will remain at relatively the same location as the existing roadway alignment. The roadway approaches would be widened from 20 feet to 32 feet wide and raised by a maximum of approximately eight feet to conform to the replacement structure.

Contact Information
Lori Perron
Placer County
3091 County Center Drive, Suite 220
Auburn, CA 95603

Phone : (530) 745-7598

Location

Coordinates
38°54'.35"N 121°10'49.05"W
Cities
Lincoln
Counties
Placer
Cross Streets
Gold Hill Road and Virginiatown Road
Zip
95658
Total Acres
20
State Highways
Hwy 193
Waterways
Auburn Ravine
Township
12N
Range
7E
Section
10

Notice of Determination

Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Placer County, 3091 County Center Drive, Suite 220, Auburn, CA 95603

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes