Knights Landing Outfall Gates Project (California Endangered Species Act Incidental Take Permit No. 2081-2015-048-02 (ITP)).

7 Documents in Project

Summary

SCH Number
2015062004
Lead Agency
Reclamation District No. 108
Document Title
Knights Landing Outfall Gates Project (California Endangered Species Act Incidental Take Permit No. 2081-2015-048-02 (ITP)).
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2015
Present Land Use
Water
Document Description
This proposed project involves the construction of a positive fish barrier on the downstream side of the existing Knights Landing Outfall Gates (KLOG) in the Colusa Basin Drain (CBD), as well as place a small amount of riprap on the right bank of the CBD immediately downstream of the KLOG. The Project will permanently impact 0.01 acres of riparian habitat, and 0.07 acres of riverbank habitat for Sacramento River winter run chinook salmon and giant garter snake, and temporarily impact 0.81 acres of giant garter snake upland habitat. The project is expected to result in incidental take of Sacramento River winter-run Chinook salmon, which is designated as endangered under the CESA, and Central Valley spring-run Chinook salmon and giant garter snake, both designated as threatened species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of project implementation.

Contact Information

Name
Todd Gardner
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Counties
Yolo
Cross Streets
Road 108 and SR 45 (nearest cross streets)
Zip
95776
Total Acres
5.89
State Highways
SR-45, Hwy 113
Schools
Science & Tech Acad.
Waterways
Colusa Basin Drain, Sacramento River
Township
11N
Range
2E
Section
15
Other Location Info
Knights Landing

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print