Lord Ranch Facility Project

3 Documents in Project

Summary

SCH Number
2015061112
Lead Agency
West Valley Water District
Document Title
Lord Ranch Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2018
Present Land Use
Pump station, reservoir, wells/Single Family Residential (R-1A)/Residential
Document Description
The proposed project consists of the construction and operation of a 1-million gallon (1.0 mg) steel-welded reservoir, which measures 80 feet in diameter and 32 feet in height; a pump station with a concrete masonry building; an arsenic water treatment facility; and two 30-inch pipelines connecting the proposed reservoir and pump station to existing facilities. The proposed improvements would occur on approx. 1.73 acres at the District's approx. 13.72 acre existing Lord Ranch Facility plus an approx. 0.09 acre off-site property between Pepper Ave. and the Lord Ranch property for an access driveway.

Contact Information

Name
Linda Jadeski
Agency Name
West Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
Rialto
Counties
San Bernardino
Cross Streets
Pepper Avenue and Baseline Road
Total Acres
15
Parcel #
0264-201-27, 0264-201-08
State Highways
SR-210
Railways
SPRR
Schools
Arroyo Valley HS
Waterways
Cajon Wash

Notice of Determination

Approving Agency
West Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print