Torrance USD Aquatic Center

2 Documents in Project

Summary

SCH Number
2015061107
Lead Agency
Torrance Unified School District
Document Title
Torrance USD Aquatic Center
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2015
Present Land Use
Z: Public Use (PU); GP: Public/Quasi-Public / Open Space
Document Description
The proposed project is the construction and operation of a new aquatic center that would accommodate the District's four high school' aquatics programs, now held at the Victor E. Benstead Plunge, a city-owned facility. The approximately 11.4-acre project site is a part of a larger property that is owned by the District and developed with school and non-school uses. The project site encompasses two ball fields and a parking lot, accessed via a private street/driveway from Crenshaw Blvd. The ball fields are used by Torrance High School, and the parking lot by patrons attending events at the ball fields and the adjacent Zamperini Stadium, which is also used by Torrance HS. The proposed project would provide two swimming pools--a warm up pool and a 60-meter Olympic size pool--surrounded by a concrete pool deck of approximately 15,200 sf.

Contact Information

Name
Donald Stabler
Agency Name
Torrance Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Torrance
Counties
Los Angeles
Cross Streets
Santa Fe Ave. and Vine Ave; major intersection: Crenshaw Blvd and Sepulveda Blvd
Zip
90501
Total Acres
11.4
Parcel #
7359-011-913
State Highways
SR-1; 107; 213
Railways
BNSF
Airports
Torrance
Schools
Shery HS, Torrance ES
Waterways
No
Township
4S
Range
14W
Section
14
Base
SBB&M

Notice of Determination

Approving Agency
Torrance Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print