Shelter Island Boat Launch Facility Improvements Project and Port Master Plan Amendment
10 Documents in Project
Summary
SCH Number
2015061029
Lead Agency
San Diego Unified Port District
Document Title
Shelter Island Boat Launch Facility Improvements Project and Port Master Plan Amendment
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2016
Present Land Use
Boat Launching Ramp, Boat Navigation Corridor, Park, and Promenade
Document Description
The RWQCB - San Diego Region is issuing a Clean Water Act Section 401 water quality certification (Cert. No. R9-2015-0152) to the project applicant. The applicant proposes improvements to the Shelter Island Boat Launch Facility within jurisdictional waters, including replacement of launch ramp, jetties (with concrete sheet pile bulkhead walls), floating docks, and gangways, installation of new public walkways and rock slope protection within the basin, re-grading of the adjacent beach area, and dredging of 900 cubic yards of sediment from the floor of the boat basin.
Contact Information
Name
Lisa Honma
Agency Name
RWQCB - San Diego Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Diego
Counties
San Diego
Cross Streets
Shelter Island Drive
Zip
92106
Total Acres
2.8
Parcel #
002-034; 002-035; 002-036; 003-019
State Highways
I-5 and SR-75
Airports
SD Int'l
Schools
Cabrillo ES
Waterways
San Diego Bay
Other Location Info
Point Loma
Notice of Determination
Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.