Minor Modifications to the Shelter Island Boat Launch Facility Improvments Project

10 Documents in Project

Summary

SCH Number
2015061029
Lead Agency
San Diego Unified Port District
Document Title
Minor Modifications to the Shelter Island Boat Launch Facility Improvments Project
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2017
Present Land Use
Boat Launching Ramp, Boat Navigation Corridor, Park, and Promenade
Document Description
Minor modifications to the project's construction limits, including temporary use of a 0.25 acre dry beach and 34 additional parking spaces for construction lay-down, and identification of a vessel maneuvering area. An Addendum was prepared to the Final MND adopted by the District on Jan. 12, 2016. An Amendment was prepared for the Coastal Development Permit issued by the District on Nov. 7, 2016 (CDP-2016-08; District Clerk #65802). No changes to footprint, design, or method of construction are proposed. The Addendum is available at the District office, 3165 PAcific Hwy, San Diego, CA 92101

Contact Information

Name
Joseph Smith
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Shelter Island Drive
Zip
92106
Total Acres
2.8
Parcel #
002-034; 002-035; 002-036; 003-019
State Highways
I-5 and SR-75
Airports
SD Int'l
Schools
Cabrillo ES
Waterways
San Diego Bay
Other Location Info
Point Loma

Notice of Determination

Approving Agency
SD Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.